2022

Masterplan and concept design of 13.5 MW site showing equipment numbers and positions: three 4.5 MW halls, four power modules per hall of 1.5, and MW each providing 4.5 MW from 4/3 distributed redundant. This was a particularly challenging site, and the design required careful consideration in order to navigate the various external factors such as the impact of surrounding factories, flood risk, and strict fuel storage restrictions.